City of Houston - Department of Public Works and Engineering - Document Center - City of Houston - Department of Public Works and Engineering - Document Center Skip to content
You are here: Home > Document Center > Engineering and Construction
Engineering and Construction

Many of the documents used in the past on the City’s Public Works (PWE) and General Services (GSD) projects are now moving to this site and we’re adding some new ones. Division 00 and 01 have been revised for use on PWE and BSD CIP projects advertising after May 1, 2004. 70-30 Developer Participation Contract (DPC) projects may use them now. Those GSD and PWE projects that are due to advertise before this threshold date should use the current Division 00 and 01 documents, which should be available through your assigned City Project Manager.

CategoriesFiles

Drawings 325 Drawings
Forms 11 Forms
Plan Room 108 Plan Room
Standards Review Committee 9 Standards Review Committee

The 2009-2010 review cycle will address all technical specifications, design standards and drawing details for the City of Houston Water Distribution, Sewage Collection, Facilities and Tunneling. The following documents are under review. The deadline to submit initial comments was September 15, 2009. Proposed changes shall be posted on the completion of the review by the Standards Review Committee for public comments. standardreviewcommittee@cityofhouston.net .

 

There are no documents in this category